What should I look for in a new excavator during the break-in period?

2024/01/11 11:10

A new or overhauled excavator must undergo a period of trial operation, often referred to as the break-in period. The purpose of this period is to prevent early wear and tear of the excavator and to prolong its service life. The following rules must be strictly enforced during the break-in period of the excavator:


(1) The excavator should hang a signboard with the words "going together" in a conspicuous place, so that the relevant personnel can pay attention to the regulations on the use of the going together period, and take it down after the going together period is over.


(2) The engine should be decelerated by 30% during the period of time, the decelerated load of 20% -30% of the operation, no one shall remove the seal of the engine speed limiting device, to be removed only after the expiration of the period of time under the supervision of the technical personnel.


(3) When starting the engine, it is strictly prohibited to slam the throttle. The engine should be warmed up for 20-50 seconds when starting at low temperature, and then start immediately. Idle the engine for 3-5 minutes after starting, and increase the speed and load only when the cooling water temperature rises to 40 degrees.


What should I look for in a new excavator during the break-in period?


(4) The technical preparation before starting the engine, the technical requirements during operation, and the technical work before stopping and after shutting down the engine should be carried out according to the requirements of the general mechanical operation regulations or the engine instruction manual.


(5) Excavator in the first 30 or 50 hours of the go together period should be digging the looser soil, each loading for the bucket capacity of 1/2, the next 70 or 50 hours of loading can be gradually increased, but shall not exceed the bucket capacity of 3/4, and reduce the operating speed.


(6) During the period of going together should always pay attention to the operation of the excavator's institutions, check the bearings, gears and friction sub-temperature, observe the hydraulic system with or without leakage phenomenon. The abnormal phenomenon in the operation should immediately stop to check the cause, and be excluded.


(7) After the full surface of the go together period should be based on the go together period of the operation of the excavator ministries for inspection, adjustment and lubrication work. At the same time check the gear box lubricant and hydraulic oil tank hydraulic oil cleanliness, if it is necessary to be replaced.


(8) Technicians should strengthen the technical management of the excavator to go together, the excavator to go together before the period should go together the requirements and precautions to the operator to explain clearly; go together in the period should check the use of the excavator, the operation of the excavator, in detail, carefully and faithfully fill in the excavator to go together the period of the use of the record sheet, the excavator to go together the period after the completion of the record sheet by the competent technical personnel to review and into the technical files of the excavator.


gerelateerde producten